Hospital layouts built to NABH standards from the first line of BIM.
Getting NABH accreditation after design is complete is expensive and disruptive. NABH prescribes specific room areas, zoning requirements, corridor widths, clean-to-dirty separation, and MEP configurations that must be embedded in the building from the outset. Our NABH-ready hospital design service integrates these standards into every stage of the BIM process — from concept layout to construction documentation — so your facility is audit-ready before the first brick is laid.
Discuss Your ProjectNABH standards embedded in every room, zone, and MEP routing decision — not added after design freezes.
Room data sheets, area schedules, and zone separation diagrams extracted directly from the BIM model.
Compliance verified in BIM before construction — eliminating costly structural changes during accreditation audit.
NABH standards and state health department norms mapped to project brief.
BIM-based concept design with zone separation, traffic flow, and room area compliance validated.
Full BIM model developed with MEP coordination, NABH room data sheets, and compliance schedules.
Drawing package, compliance evidence report, and audit-ready documentation issued.
Healthcare Facilities
From NABH gap assessment to accreditation certificate — structured consulting for first-attempt success.
Healthcare Facilities
Functional, compliant, and patient-centred healthcare layouts in BIM.
Common questions about our NABH-Ready Hospital Design service.
We design for the full range of NABH facility types: hospitals above and below 50 beds, medical colleges, eye hospitals, dental clinics, medical imaging centres, blood banks, Ayurveda and naturopathy centres, and care homes.
We work to the current NABH Hospital Standards (5th Edition) and update our approach when revised standards are published. We also cross-reference relevant state health department guidelines and the National Building Code.
Yes — JCI and NABH have overlapping requirements and complementary standards. We design to the more demanding requirement where they differ, providing compliance evidence for both simultaneously.
Yes — AERB radiation safety requirements for X-ray, CT, MRI, and radiotherapy departments are incorporated into our shielding calculations, room layouts, and signage design.
We model clean, dirty, and restricted zones as separate BIM room categories and verify separation distances, surface material specifications, and HVAC pressure zone requirements against NABH infection control standards.
Yes — we start with a Scan-to-BIM capture of the existing facility, overlay the NABH compliance requirements, identify gaps, and design the minimum intervention needed to achieve compliance.
Share your project brief and our BIM specialists will respond within one business day.